The Kirkpatrick's D.I.Y. Project for 2005
Electrical Work
October 21 - 23, 2005
Another weekend of RAIN.
Mike and Chuck worked anyway.
I stayed home and stayed dry!
This meter box had to be installed because Allegheny
Power should be hooking us up to power sometime soon.
This is the back of the house where the wiring goes into the building.
The panel inside the garage.
A picture of the open panel.
The bolts holding the meter box in place.
We're off October 28 - 30 because Mike went to Chicago
for a plumbing convention. It snowed in Romney on October 24.
I sure hope we get those shingles installed soon!
|