![]() |
Last Updated: | |
Counter & Bedroom PrepAugust 24 - 26, 2007![]() There was lots to do this weekend. All of our equipment barely fit into the truck. ![]() I finally took the quilt I made to put on our bed. ![]() Mike's big task was forming the countertop to prep for the concrete pour. ![]() Forming the edge. ![]() The inside edge is finished. ![]() Now its time for the outside edge. ![]() This is where the sink will be. ![]() Meg likes the new doggie bed I made. ![]() Preparing the opening for the stove. ![]() In some weird twist of magnetic forces that affected certain mountain locales ![]() The form work is done. ![]() Mike adds the wire mesh to reinforce the concrete. ![]() Here he is cutting the mesh to fit. ![]() The rebar has been added. ![]() The form is finished. ![]() Next weekend, we should be able to pour the concrete. ![]() I did do some work finishing the drywall in the main house. ![]() Mike also had to work in the garage so we can hang drywall. ![]() Wires and stuff that he worked on, like insulating the ducts. ![]() Part of the work included running telephone wires. ![]() This is where the wires exit the house. ![]() I also painted the door between the main house and spare bedrooms. |
||
Free Gifs and Animations - Everything needed to build or enhance your Web site. |